Gold Member Since 2015
Audited Supplier
Yueqing Haixin Electronic Science Technology Co., Ltd.

Prepaid Meter, IC Card Meter, Electronic Meter manufacturer / supplier in China, offering Three Phase Prepaid Watt-Hour Electricity Meter LCD Display, Three Phase Current Transmitter, Three Phase AC Current Transducer and so on.

(/ )

Supplier Homepage Product Prepaid meter Three Phase Prepaid Watt-Hour Electricity Meter LCD Display

Three Phase Prepaid Watt-Hour Electricity Meter LCD Display

FOB Price: US $45.13 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $45.13/ Piece
Get Latest Price
Port: Ningbo, China
Payment Terms: L/C, T/T, D/P, Western Union, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: DTSY
  • Usage: Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter, Prepayment Meter, Reactive Energy Meter
  • Theory: Electronic Meter
  • Measured Signal: Continuous Wave
  • Certification: RoHS, CE
  • Voltage: 0-500V
  • Display: Digital
  • Electric Equipment: Three-phase Four-wire
  • Power Meter Connection: Feed-through Type
  • Type: Energy Meter
  • Customized: Customized
Product Description
2. Specifications and main technical parameters

Three Phase Prepaid Watt-Hour Electricity Meter LCD Display

2.1 Specifications

 
Model Precision
Grade
voltage specification(V)current specification(A)
DDSY1561.02. Specifications and main technical parameters
2.1
Specifications and main technical parameters
ModelCategoryThe reference voltage UnRated current In
DSSY156Three-phase three-wire3×100V3×1.5(6)A
DTSY 156Three-phase three -wire3×57.7/100V3×1.5(6)A
3×220/380V3×1.5(6)A
3×5(20)A
3×10(40)A
3×15(60)A
3×20(80)A
3×30(100)A
 
Model Precision
Grade
Reference voltage
Un
Rated current
Ib
Insert modeMeter constant
imp/kWh
DTSY156
DSSY156
1 or 23X220/380
3X57.9/100
1.5(6)Mutual inductance1600
5(20)Direct800
10(40)Direct400
15(60)Direct400
20(80)Direct400
 
itemtechnical parameter
Precision gradeActive power 1.0 grade,2.0grade
Reference voltage(Un)220V
Reference current(In)5(40)A,10(60)A,20(100)A
Reference frequency50Hz
Working voltage rangestipulated working voltage range:0.9Un~1.1Un
Expanded working voltage range:0.8Un~1.2Un
Working temperature rangestipulated working voltage range:-25ºC ~+55ºC
limited working voltage range:-40ºC ~+70ºC
Storage and transportation limited temperature range:-40ºC ~+70ºC
Power consumptionVoltage circuit:≤2W/5VA;current circuit:≤1VA
 
 2.2  Basic error (balance load error limit)
Current valuePower factor
(COSφ)
Basic error(%)
Connect to meter directlyConnect to meter through mutual inductor12
0.05Ib<=I<0.1Ib0.02Ib<=I<0.05In1±1.5±2.5
0.1Ib<=I<Imax0.05In<=I<Imax1±1.0±2.0
0.1Ib<=I<0.2Ib0.05In<=I<0.1In0.5(inductive)
0.8(capacitive)
±1.5±2.5
0.2Ib<=I<Imax0.1In<=I<Imax0.5(inductive)
0.8(captive)
±1.0±2.0
 
Notes:(Ib means basic current, In means rated current, Imax means max current.)
 
2.3 Start:
   When Reference voltage, reference frequency and COSφ=1.0,the meter whose load current is  0.004Ib(Grade 1),0.005Ib(Grade 2) can measure electricity.
2.4 Creep:
    Test output of the meter should not be more than one pulse when voltage loop pluses 115% rated voltage, there is no current in current circuit. 
2.5 Range of voltage:
   Normal working voltage:0.9Un-1.1Un
   Limited working voltage:0.8Un-1.15Un
2.6 Power consumption:
   Voltage circuit consumption:<=2Wand 10VA
   Current circuit consumption:<=4.0VA
 
3. Principle of operation
3.1 Principle of operation details
 
 Voltage divider gets voltage sampled signalcurrent transformer gets current sampled signal, and multiplying units get voltage and current product signal. After frequency conversion, there will be a count pulse which frequency is proportional to product of voltage and current.
3.2 Data processing
Electric energy measuring pulse is stored in non-volatile EEPROM after CPU processing through photo coupler. Computer manages information system and IC reading and writing card inputs a certain amount of electricity and microprocessor system with Monitoring requirements. And it will supply displaying signal, alarm signal and cut-off state signal after CPU processing.  
4. Installation and how to use
4.1 Watt-hour meters have passed strict inspection before they leave the factory and they are be sealed stereotype. The meters which don't have stereotype or are stored for a too long time should be rechecked before installation.  
 
4.2 Watt-hour meter should be installed indoors which is dry and well-ventilated. And they usually adopt installation mode that they are hanged vertically. Installation height is proposed in 1.8 meters. The installation baseboard should be fixed in walls which is strong, not easy to vibrate and fire-resistant.
 
4.3 In filthy places which watt-hour meter should be installed in protective cabinet.
 
4.4 You should install and connect according to instruction manual or connection diagram, and it's better to use copper joints to introduce to avoid burning the meters because of poor contact.
 
4.5 In places where lightning is much, you should take measure of lightning protection to avoid burning the meters because of lightning. 
 
4.6 Watt-hour meter's load capacity is 0.05Ib~Imax (access directly) or 0.02Ib~Imax (access through transformer). If it is more than this load capacity, watt-hour meter will measure inaccurately or current coil will de burned.
 
4.7 When watt-hour meter is accessed through transformer, actual electricity is the displayed number multiplied by the ratio.  
 
4.8 A card for a meter: IC cards users hold are not interchangeable. You can buy one from power supply department if it lost. 
 
4.9 Preparation of purchasing electricity: IC card should be inserted into cassette, so that data in the meter can be sent to computer database.
 
4.10 Electricity purchasing mode: When purchasing electricity, IC card should be inserted into IC card reader, operate computer and identifier users at he same time. Capacity limit, power limit, etc. should be written into IC card with encryption when purchasing in advance.
 
4.11 Using IC card: IC card should be inserted into cassette. If it is a valid IC card, the meter will read the data automatically. Display scream will display orderly: power purchasing quantity(P0== XXXX), total power purchasing quantity (P=XX XXXX),purchasing times(PC== XXXX),alarm power quantity(P1==XXXX), Credit limit (P2== XXXX),power limit capacity (F0X= XX:XX). Please save the card.
 
4.12 Operation display: Display scream will turn to show remaining power quantity and total power consumption when meter is operating.
 
4.13 Over capacity alarm: When meter is process of operation, "alarm indicator lamp" flashing displays quickly. It warms the users that it is over power capacity. If the user set limit capacity mode of cutting power when overcapacity, 30s after overcapacity, brake pull 3 minutes, the meter will restore power supply in countdown mode (180s). If user inserts the card, the meter can restore power supply right now. 
 
4.14 Hoarding power quantity: If purchasing power quantity + remaining power quantity> hoarding power quantity(10000kwh), purchasing power quantity can not read, display scream show tips of "surplus limited quantity", power quantity in the card is valid. 
 
4.15 Warning remind: when remaining power quantity is less than 2 times of "alarm power quantity""alarm indicator lamp" will flash (interval is 1s )to remind users to buy electricity .If users insert the card, "alarm indicator lamp" 's flashing interval will change to 2s, it can avoid power off warning.
 
4.16 Power off warning: If users don't insert the card and users set warning when overcapacity, remaining electricity is conventional warming electricity or 10% of purchasing electricity, and watt-hour meter switches off and warns, and display scream shows "brake pull" .At this time ,It can restore power supply if IC card inserts into IC cassette. If you can not find IC card after brake pull, you can borrow neighbors' IC card to restore power supply.
 
4.17. Purchasing electricity warning: "alarm indicator lamp" will light continuously to remind users when remaining electricity is less than "alarm electricity".
 
4.18 Failing report: when remaining electricity is zero or negative value, display scream shows "brake pull". f meter can go on operating, users should buy electricity right now, and reflect to power supply department initiatively.
 
  

 
Notes:(Ib means basic current, In means rated current, Imax means max current.)
 
2.3 Start:
   When Reference voltage, reference frequency and COSφ=1.0,the meter whose load current is  0.004Ib(Grade 1),0.005Ib(Grade 2) can measure electricity.
2.4 Creep:
    Test output of the meter should not be more than one pulse when voltage loop pluses 115% rated voltage, there is no current in current circuit. 
2.5 Range of voltage:
   Normal working voltage:0.9Un-1.1Un
   Limited working voltage:0.8Un-1.15Un
2.6 Power consumption:
   Voltage circuit consumption:<=2Wand 10VA
   Current circuit consumption:<=4.0VA
 
3. Principle of operation
3.1 Principle of operation details
 
 Voltage divider gets voltage sampled signalcurrent transformer gets current sampled signal, and multiplying units get voltage and current product signal. After frequency conversion, there will be a count pulse which frequency is proportional to product of voltage and current.
3.2 Data processing
Electric energy measuring pulse is stored in non-volatile EEPROM after CPU processing through photo coupler. Computer manages information system and IC reading and writing card inputs a certain amount of electricity and microprocessor system with Monitoring requirements. And it will supply displaying signal, alarm signal and cut-off state signal after CPU processing.  
4. Installation and how to use
4.1 Watt-hour meters have passed strict inspection before they leave the factory and they are be sealed stereotype. The meters which don't have stereotype or are stored for a too long time should be rechecked before installation.  
 
4.2 Watt-hour meter should be installed indoors which is dry and well-ventilated. And they usually adopt installation mode that they are hanged vertically. Installation height is proposed in 1.8 meters. The installation baseboard should be fixed in walls which is strong, not easy to vibrate and fire-resistant.
 
4.3 In filthy places which watt-hour meter should be installed in protective cabinet.
 
4.4 You should install and connect according to instruction manual or connection diagram, and it's better to use copper joints to introduce to avoid burning the meters because of poor contact.
 
4.5 In places where lightning is much, you should take measure of lightning protection to avoid burning the meters because of lightning. 
 
4.6 Watt-hour meter's load capacity is 0.05Ib~Imax (access directly) or 0.02Ib~Imax (access through transformer). If it is more than this load capacity, watt-hour meter will measure inaccurately or current coil will de burned.
 
4.7 When watt-hour meter is accessed through transformer, actual electricity is the displayed number multiplied by the ratio.  
 
4.8 A card for a meter: IC cards users hold are not interchangeable. You can buy one from power supply department if it lost. 
 
4.9 Preparation of purchasing electricity: IC card should be inserted into cassette, so that data in the meter can be sent to computer database.
 
4.10 Electricity purchasing mode: When purchasing electricity, IC card should be inserted into IC card reader, operate computer and identifier users at he same time. Capacity limit, power limit, etc. should be written into IC card with encryption when purchasing in advance.
 
4.11 Using IC card: IC card should be inserted into cassette. If it is a valid IC card, the meter will read the data automatically. Display scream will display orderly: power purchasing quantity(P0== XXXX), total power purchasing quantity (P=XX XXXX),purchasing times(PC== XXXX),alarm power quantity(P1==XXXX), Credit limit (P2== XXXX),power limit capacity (F0X= XX:XX). Please save the card.
 
4.12 Operation display: Display scream will turn to show remaining power quantity and total power consumption when meter is operating.
 
4.13 Over capacity alarm: When meter is process of operation, "alarm indicator lamp" flashing displays quickly. It warms the users that it is over power capacity. If the user set limit capacity mode of cutting power when overcapacity, 30s after overcapacity, brake pull 3 minutes, the meter will restore power supply in countdown mode (180s). If user inserts the card, the meter can restore power supply right now. 
 
4.14 Hoarding power quantity: If purchasing power quantity + remaining power quantity> hoarding power quantity(10000kwh), purchasing power quantity can not read, display scream show tips of "surplus limited quantity", power quantity in the card is valid. 
 
4.15 Warning remind: when remaining power quantity is less than 2 times of "alarm power quantity""alarm indicator lamp" will flash (interval is 1s )to remind users to buy electricity .If users insert the card, "alarm indicator lamp" 's flashing interval will change to 2s, it can avoid power off warning.
 
4.16 Power off warning: If users don't insert the card and users set warning when overcapacity, remaining electricity is conventional warming electricity or 10% of purchasing electricity, and watt-hour meter switches off and warns, and display scream shows "brake pull" .At this time ,It can restore power supply if IC card inserts into IC cassette. If you can not find IC card after brake pull, you can borrow neighbors' IC card to restore power supply.
 
Three Phase Prepaid Watt-Hour Electricity Meter LCD Display
 

 



Three Phase Prepaid Watt-Hour Electricity Meter LCD Display
OEM-ODM Service Offered

1.Material,size and other requirements of  Led Traffic Signal Light can be customized.

2.Please kindly inform us which items you are interested & the reasonable price will be provided you upon receipt of your new inquiry ASAP.

3.Answer your question detailed.

4.Solve the problem with you during using our products.

5.You can visit our website: http://cnhxdz.en.made-in-china.com/

Payment Methods

We accept 30% payment in advance, the balance payment before shipping.

We also accept L/C according to the order amount

We can accept the payment by T/T, Western Union, Paypal, Private Account, Escrow,Cash,and others

Packing And Shipment

We can ship the goods for you by following ways:

1.By Express: DHL, FEDEX, UPS, TNT, SF EXPRESS and China Post, China Small Package and so on.

2. By Air: We can ship from Ningbo, Shanghai, Shenzhen, Hongkong, Urumqi, Beijing.

3. By Sea: We can offer you FOB Ningbo, FOB Shanghai, FOB Shenzhen, FOB Urumqi, FOB XiaMen, FOB Beijing.

4. We also can send to your forwarder or agent in China, who can arrange shipment for you.

 

 

 FAQ:

1.Q:How can I get the samples?

  A:If you need some samples to test,please pay for the transportation freight of samples and our samples will be counted on the next order .We send the samples to you only after receipt of your payment.

 

2.Q:How much the transportation freight will be for the samples?
  A:The freight depends on the weight and packing size and your area.

 

3.Q:How can I get your Price list?
  A:Please send us your email or fax and order information,then I can send you the price list.

 

4.Q:Can we have our logo or company name to be printed on your products or the package?
  A:Sure.Your Logo can be puted on our products by sticker.And if you want your logo and company name to be printed on the cartons for the products,you can send us the artwork by email.

 

5.Q:How to order?
  A:Please send us your purchase order by email or fax or you can ask us to send you a proforma invoice for  your order.
 

Thanks for your view,Welcome to visit our

Website:http://cnhxdz.en.made-in-china.com/

Name:Lemon

Tel:+86 13305775392

 
Send your message to this supplier
Avatar
Miss tree
*From:
To: Miss tree
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now